Future Mass Rapid Transit (MRT) interchange and terminus | |||||||||||||||
General information | |||||||||||||||
Location | 3 Bedok Road Singapore 469731 | ||||||||||||||
Coordinates | 1°19′13″N 103°57′26″E / 1.32031°N 103.95709°E | ||||||||||||||
Owned by | Land Transport Authority | ||||||||||||||
Operated by |
SBS Transit DTL Pte Ltd (
ComfortDelGro Corporation) (Downtown line) SMRT Trains Ltd ( SMRT Corporation) (Thomson–East Coast line) | ||||||||||||||
Line(s) | |||||||||||||||
Platforms | 4 ( 2 island platforms) | ||||||||||||||
Construction | |||||||||||||||
Structure type | Underground | ||||||||||||||
Depth | 27m | ||||||||||||||
Platform levels | 2 | ||||||||||||||
Accessible | Yes | ||||||||||||||
History | |||||||||||||||
Opening | 2026 | ||||||||||||||
Previous names | Eastwood [1] | ||||||||||||||
Services | |||||||||||||||
| |||||||||||||||
|
Sungei Bedok MRT station is a future underground Mass Rapid Transit interchange and terminal station on the Downtown line and Thomson–East Coast line in Bedok planning area, Singapore. [2] The station is being built east of where Upper East Coast Road becomes Bedok Road, and will serve residents of the Eastwood estate. Nearby facilities include the Bedok Food Centre, Eastwood Centre and the Laguna National Golf & Country Club. [3]
The station is named after Sungei Bedok, a small river within its vicinity. Despite its name and location, the station is not contiguous to either Bedok North or Bedok Reservoir stations of the Downtown line.
This station was first announced on 15 August 2014 as part of the Downtown line stage 3e, consisting of 2 stations between Xilin and Sungei Bedok, and the Thomson–East Coast line phase 5, also consisting of 2 stations between Bedok South and Sungei Bedok MRT. It was expected to be completed in 2024, in tandem with the adjacent East Coast Integrated Depot. [4] However, due to the COVID-19 pandemic, this station was expected to commence passenger service in 2025 instead. [5] [6] [7] Due to challenges of tunnelling near existing critical infrastructure, the station is now expected to commence passenger service in 2026. [8]
While serving as the future eastern terminus of the Downtown line, it will also serve as the eastern terminus of the Thomson–East Coast line until 2040, which will be extended to Changi Airport Terminal 5 and existing Changi Airport stations, before terminating at Tanah Merah. [9] [10]
Contract T312 for the design and construction of Sungei Bedok Station and associated tunnels was awarded to KTC Civil Engineering & Construction Pte Ltd for S$418 million in June 2016. Construction began in 2016. [11]
In 2025, the 2.2km future extension of the DTL3 from Expo station will join the EWL and future TEL to allow commuters to easily transfer between the DTL and TEL.