PasuruanâProbolinggo Toll Road | |
---|---|
Paspro Toll Road | |
![]() Westbound PasuruanâProbolinggo Toll Road heading to
Pasuruan Regency in 2023 | |
Route information | |
Part of ![]() | |
Maintained by PT Trans Jawa Paspro Jalan Tol (TJPJT) | |
Length | 38.3 km (23.8 mi) |
Existed | 2018âpresent |
Major junctions | |
West end | Grati |
East end | Gending |
Location | |
Country | Indonesia |
Provinces | East Java |
Major cities | |
Highway system | |
PasuruanâProbolinggo Toll Road or Paspro Toll Road is a toll road in East Java, Indonesia. This 38.3 kilometers (23.8 mi) highway connects Pasuruan with Probolinggo. The toll road is operational since the end of 2018. [1] [2] [3]
The Paspro toll road project consists of three sections, [4]
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
East Java | Grati, Pasuruan Regency | 809.2 | 502.8 |
![]() | |||
809.9 | 503.2 | 810 (824) | Grati Toll Gate |
| Western terminus | ||
Tongas, Pasuruan Regency | 822.6 | 511.1 | 822 (836) | Tongas Toll Gate |
| ||
Sumberasih, Probolinggo Regency | 829.6 | 515.5 | 829 (843) | Probolinggo Barat Toll Gate |
| ||
Leces, Probolinggo Regency | 840.4 | 522.2 | 840 (854) | Probolinggo Timur Toll Gate | |||
Gending, Probolinggo Regency | 848.5 | 527.2 | 848 (862) | Gending Toll Gate |
| ||
854.3 | 530.8 |
![]() | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|