Nagasandra is the elevated northern terminal metro station on the North-South corridor of the Green Line of Namma Metro serving the Bagalakunte area in Bangalore, India. It was opened to the public on 1 May 2015. [1] A foot overbridge connecting Nagasandra metro station to IKEA store was inaugurated on 18 October 2023. [2] [3]
Nagasandra track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
** (Further extension to Madavara metro station in the future) |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Silk Institute next station is Dasarahalli | |
Platform 1 Northbound |
Towards ← Train Terminates Here (to be further extended to Madavara metro station in the near future) | |
Side platform | Doors will open on the left | ||
L2 |
There are 3 Entry/Exit points – A, B and C. Commuters can use either of the points for their travel.