Långå wind park | |
---|---|
| |
Country | Sweden |
Location | Långåvålen, Jämtland County |
Coordinates | 62°28′10″N 13°16′55″E / 62.46944°N 13.28194°E |
Status | planned |
Owner(s) | Agrivind AB |
Power generation | |
Units operational | 5x Enercon 2 MW |
Nameplate capacity | 10 MW |
The Långå wind park ( Swedish: Långå Vindpark Härjedalen) is a wind farm in Långåvålen near the village of Långå in Härjedalen Municipality, Jämtland County, Sweden. [1] It was built at a cost of 125 million Swedish kronor by Agrivind AB of Västergötland. [2]
The park has five units (Långå 1 - 5), each German-manufactured Enercon turbines rated at 2000 kW. [3] The turbines have a tower height of 85 metres (279 feet) and a total height of 125 metres (410 feet). [2]