![]() S Tupi
| |
History | |
---|---|
![]() | |
Name | Tupi |
Namesake | Tupi |
Builder | Howaldtswerke-Deutsche Werft |
Laid down | 8 March 1985 |
Launched | 28 April 1987 |
Commissioned | 6 May 1989 |
Identification | Pennant number: S-30 |
Status | Active |
General characteristics | |
Class and type | Tupi-class submarine |
Displacement | |
Length | 61.2 m (200 ft 9 in) |
Beam | 6.25 m (20 ft 6 in) |
Draft | 5.5 m (18 ft 1 in) |
Propulsion |
|
Speed |
|
Range |
|
Endurance | 50 days [1] |
Test depth | 500 m (1,600 ft) |
Complement | 30 |
Armament |
|
S Tupi (S-30) is the lead boat of the Tupi-class submarine of the Brazilian Navy. [2] [3]
The boat was built at Howaldtswerke-Deutsche Werft in Germany and was launched on 28 April 1987 and commissioned on 6 May 1989.
Media related to
S30 Tupi (submarine, 1989) at Wikimedia Commons