The LRT Shah Alam Line, previously known as the LRT Bandar UtamaâKlang Line, LRT Bandar Utama-Johan Setia Line or simply LRT Johan Setia Line,[5] is a
medium-capacity light rapid transit (LRT) line which will be serving the
Shah Alam and
Klang regions on the western side of the
Klang Valley,
Malaysia. It will be the third LRT line, and the fourth
fully automated and driverless rail system in the
Klang Valley region. The line will be operated as part of the
Rapid KL system by
Rapid Rail, a subsidiary of
Prasarana Malaysia.[6][7] It was announced by
Prasarana Malaysia on 24 April 2013.[8][9]
Once completed, the line will form part of the Klang Valley Integrated Transit System. It is numbered 11 and coloured sky blue on official transit maps.
Previously, a total of 26 stations were planned, with a proposed two-kilometre distance between each station. One station was to be an underground station, with the other 25 being elevated.
The alignment is based on the Final Railway Scheme approved by the Land Public Transport Commission (SPAD).
Due to the change of government in the
2018 Malaysian general election, the new
Pakatan Harapan government decided to cut costs around the project and shelved six stations from the initial plan. The Lien Hoe, Temasya, SIRIM, Bukit Raja and Bandar Botanik stations were converted into provisional stations while the underground station of Persiaran Hishamuddin was cancelled. The reasons cited for the changes made were due to the high cost of the project, unnecessary tunneling for the underground portion of the line and low ridership in the area. The provisional stations however will be built once the demand in the area picks up.[10][11]
Other cost-cutting exercises including the swapping of six-car trains for three-car trains, cutting down the total trains from 42 to 22, reducing the size of the stations and ditching costly acceleration techniques. The completion date also was extended from 2020 to 2024.[10][11]
In July 2023, Transport Minister Anthony Loke mentioned that the overall line would be expected to be operational by 1 March 2025 adding more delays to the opening of the Shah Alam Line.[12] This would be the third delay to the project's completion date.
During the Budget 2024 presentation held on 13 October 2023, Finance Minister Dato' Seri Anwar Ibrahim announced the reintegration of the five stations that were previously under provisional status (
Tropicana,
Temasya,
Raja Muda,
Bukit Raja Selatan,
Bandar Botanik) to be built alongside the rest of the Shah Alam Line with the exception of the sole underground station, Persiaran Hishamuddin, which remains cancelled.[13]
Alignment and station list
The line currently has 25 permanent stations under construction.[14]
30 May 2014 â The Shah Alam LRT would begin from Bandar Utama,
Kelana Jaya, through areas of Glenmarie, HICOM-Glenmarie Industrial Park,
Shah Alam Stadium,
Shah Alam city centre,
UiTM,
I-City, Bukit Raja Shopping Centre, Taman Eng Ann, Bandar Klang and then heading straight on to Johan Setia.[16]
17 July 2014 â Following 2015 Budget which is tabled on 10 October 2014, the Prime Minister announced that the government will fund RM9 billion to build the LRT3 project linking Bandar Utama to Shah Alam and
Klang, which is already in Prasarana's drawing board.[17]
23 July 2014 â There are several disputes on the proposed routes with the main concern is on the line's integration with the Sungai Buloh-Kajang MRT line.[18]
11 October 2014 â The project was approved with an allocation of RM9 billion.[19] This line is no longer be an extension of the LRT Kelana Jaya Line[20] as initially proposed.
13 December 2014 â Prasarana to roll out LRT3 projects by second half of 2015[21]
11 April 2015 â Tender documents for RM9bil LRT3 project ready for collection[22] LRT3 will be integrated with
Kelana Jaya Line in Glenmarie LRT Station, which is currently being built as a part of the Kelana Jaya Line extension project. LRT3 is expected to be used by 300,000 users. The public display of the line will be held for three months beginning in May.[23][24][25]
15 May 2015 â Day One of Public Inspection of LRT3 Railway Scheme.[33]
4 September 2015 â Prasarana Malaysia Berhad announced that
Malaysian Resources Corporation Berhad (
MRCB) and George Kent Sdn Bhd joint venture (JV) has been appointed as the Project Delivery Partner (PDP) for the Bandar UtamaâKlang (LRT3) project.[34]
20 October 2015 â Prasarana has agreed to change the LRT3 route, which was originally planned to cut through the housing area of Taman Muhibah in
Klang to Pasar Besar Klang (Klang wet market) at Jalan Meru. Residents of Taman Muhibah had been objecting the proposed line which would run through their housing area.[35]
24 August 2016 â Official launch of the LRT3 project by the former Malaysian Prime Minister Najib Razak.[36]
25 July 2018 - Cost-cutting exercises officially approved by
Pakatan Harapan government. Five stations converted into provisional stations. One station cancelled. Six-car trains swapped for three-car trains, total trains cut down from 42 to 22, stations size reduced, acceleration techniques ditched and completion date extended from 2020 to 2024.[10][11]
15 June 2020 â Day One of Public Inspection of LRT3 Revised Railway Scheme, on display until 15 September 2020.[37]
1 July 2021 â As of Q2 2021, LRT3 overall linewide progress achieve 57.57%.
16 August 2022 â As of Q2 2022, LRT3 overall linewide progress achieve 74.04%.[38]
2 April 2023 - LRT 3 construction progress reached 83.52% completion[39]
4 July 2023 - LRT 3 construction progress reached 86% completion and expected to completed by March 2025, delayed from the original 2024 scheduled opening year.[40]
13 October 2023 - Five stations that were previously on provisional status are now slated to be built by 2027 alongside the completion of the Shah Alam Line. The Persiaran Hishamuddin station is the only one that remains cancelled.[41]
Other Information
Initially, the Klang LRT station (now
Pasar Jawa) was planned as an interchange station with the Klang KTM station. However, due to efforts to reduce cost and objections from Little India Klang business residents, the station will be built beside Emporium Makan and Shaw Centrepoint Mall which is 700 meters away from the KTM Komuter station, resulting in a same-name but different stations situation, similar to Salak Selatan
LRT/
KTM and Sentul
LRT/
KTM stations. [42][43]
The line will be connected with 3 retail malls and shopping centres, namely the Shaw Center Point (The Store), Lotus's Klang (formerly TESCO Bukit Tinggi) and
AEON Bukit Tinggi in
Klang.[44]
The trains will have a maximum operating speed of 80 km/h (17% faster than the current
Kelana Jaya Line) with the capacity of carrying 36,720 passengers per hour per direction.[45]
^Rapid KL (5 August 2021).
"LRT3 kini dikenali sebagai LRT Laluan Shah Alam". Facebook (in Malay). Retrieved 23 September 2021. LRT3 atau dahulunya LRT Laluan Bandar Utama â Johan Setia, kini secara rasmi akan dikenali sebagai LRT Laluan Shah Alam.