Antuco Hydroelectric Plant is a hydroelectric power station in Bío Bío Region, Chile. The plant uses water from Laja River and produces 300 megawatts (400,000 hp) of electricity. [1] The plant was built by ENDESA in 1981 . [1]
37°18′36″S 71°37′36″W / 37.3100°S 71.6267°W